News

Home News

Assembling of the cooling system

2018-05-25

In order to control the environment inside the greenhouse, once we finished the heating system installation, we start the installation of the cooling system.
Thus, even at high ambient temperatures in summer, we will be able to control the relative humidity of the air as well as the temperature inside the greenhouse, creating the ideal conditions for the development of Pleurotus.

Assembling of the cooling system

News 2018

Aguarela Verde at the Paris Wholesale Market

First harvesting of Pleurotus

First bags of substract in the greenhouse

Assembling of the cooling system

Instalation of the Equipments for Pasteurization

2024 2023 2022 2021 2020 2019 2017 2016 2015

Import & Export

Aguarela Verde, Lda.
Rua São Tomé, Nº 57, Cioga do Campo, 3025-632 São João do Campo, Portugal

(+351) 968 791 175
Chamada para rede móvel nacional

info@aguarela-verde.pt

Shiitake Production

João Pedro Lobato, Lda.

(+351) 968 791 175
Chamada para rede móvel nacional

jp.lobato@aguarela-verde.pt

Pleurotus Production

Gonçalo Cravo Sampaio, Lda.

(+351) 919 176 266
Chamada para rede móvel nacional

gc.sampaio@aguarela-verde.pt

Exotic Mushrooms Production

José Miguel Amaral, Lda.

(+351) 913 239 911
Chamada para rede móvel nacional

de.tavares@aguarela-verde.pt

developed by Rilop

© 2024 Rilop

>